Posts

Showing posts with the label Green Building

Preparation of surface for waterproofing work.

Image
  HOW TO PREPARE SURFACE FOR WATERPROOFING :-     All surface area should be cleaned well to make visible of hair cracks / aggregate texture and opened the all the joints and construction joints.   Cleaning of RCC member should be done by hacking tool, wire brush, wire grinder & air blower etc. Make sure all kind of dust particles, oil & grease should be removed properly  ·          All visible cracks & construction joints should be sealed with cement mortar with additive Conplast  WL after making V groove.             All clean & treated area should test for water tightness by flooding water for minimum 75 mm head for 48 hours.     All wet spots, water leak & honeycomb areas should be mark for treatment. It shall be treated with        injection grouting with Cebex 100 as additive to be added in grout cement slurry @ dosage of ...

Basic Concept of Green Building

Image
 Hello guys,                 In this video I am going to explain you about green building basic concepts, advantage and disadvantage of green building, how green building works.